Noise Action Plan for Brisbane
The Noise Action Plan for Brisbane is Airservices Australia’s plan to reduce the impact of aircraft noise on the communities of the wider Brisbane area. The plan was developed to address impacts resulting from changes to Brisbane’s airspace, following the introduction of Brisbane Airport's new parallel runway in July 2020.
The Noise Action Plan for Brisbane comprises four packages of work.
Airservices is actively engaging with industry stakeholders and the wider Brisbane community on aircraft noise, discussing potential flight path options and outlining key delivery milestones over three years (2023-2025).
Community wellbeing support
Airservices Australia has extended our Employee Assistance Program to any community member who is feeling negatively affected by aircraft operations. This assistance program is a confidential service, provided at no cost to community members. The assistance program is provided by Converge International and is completely independent of Airservices Australia. Learn more here.
Engage Airservices
You don’t need to register to just review our flight path materials. However, you do need to register to provide us with your feedback. To register, click on the ‘Register’ button on the top right-hand side of the website. Learn more about registering here.
To receive Noise Action Plan for Brisbane updates, please enter your email address in the ‘Stay Informed’ tool on the right-hand side of the project page and click ‘Subscribe’ (if you're accessing this page on a mobile device, you may need to scroll down to find this tool). We provide alerts of program updates and engagement opportunities via email to subscribers and registered users.
The Noise Action Plan for Brisbane is Airservices Australia’s plan to reduce the impact of aircraft noise on the communities of the wider Brisbane area. The plan was developed to address impacts resulting from changes to Brisbane’s airspace, following the introduction of Brisbane Airport's new parallel runway in July 2020.
The Noise Action Plan for Brisbane comprises four packages of work.
Airservices is actively engaging with industry stakeholders and the wider Brisbane community on aircraft noise, discussing potential flight path options and outlining key delivery milestones over three years (2023-2025).
Community wellbeing support
Airservices Australia has extended our Employee Assistance Program to any community member who is feeling negatively affected by aircraft operations. This assistance program is a confidential service, provided at no cost to community members. The assistance program is provided by Converge International and is completely independent of Airservices Australia. Learn more here.
Engage Airservices
You don’t need to register to just review our flight path materials. However, you do need to register to provide us with your feedback. To register, click on the ‘Register’ button on the top right-hand side of the website. Learn more about registering here.
To receive Noise Action Plan for Brisbane updates, please enter your email address in the ‘Stay Informed’ tool on the right-hand side of the project page and click ‘Subscribe’ (if you're accessing this page on a mobile device, you may need to scroll down to find this tool). We provide alerts of program updates and engagement opportunities via email to subscribers and registered users.
-
CLOSED: This phase of engagement has concluded.
Package 3 of the Noise Action Plan for Brisbane focuses on concepts for reducing frequency and concentration of aircraft over some communities that experience the highest volumes of air traffic. There are five sets of concepts that you can give feedback on, but you're also invited to provide overall feedback on Package 3.
Please review the Package 3 Overview before providing your feedback. Download Package 3 Overview
Open to feedback until Sunday 15 September 2024.
Ensure you're subscribed to the Noise Action Plan for Brisbane for any project updates. If you have a specific question you'd like a direct reply to, please contact us at communityengagement@airservicesaustralia.com.
-
CLOSED: This phase of engagement has concluded.
Purpose: To reduce the frequency and concentration of departing flights over communities aligned with the new runway, and under these departure paths in Brisbane’s inner west and outer north-west (including suburbs within Moreton Bay City Council).
Please note these are concepts only and not specific flight path location proposals. Please review Set 1 information before giving your feedback.
Open to feedback until Sunday 15 September 2024.
-
CLOSED: This phase of engagement has concluded.
Purpose: To reduce the frequency and concentration of arriving flights over communities in Brisbane’s outer north-west (including suburbs within Moreton Bay City Council).
Please note these are concepts only and not specific flight path location proposals. Please review Set 2 information before giving your feedback.
Open to feedback until Sunday 15 September 2024.
-
CLOSED: This phase of engagement has concluded.
Purpose: To reduce the frequency and concentration of departing flights over communities in Brisbane’s south-east (including suburbs within Redland City Council and Logan City Council).
Please note these are concepts only and not specific flight path location proposals. Please review Set 3 information before giving your feedback.
Open to feedback until Sunday 15 September 2024.
-
CLOSED: This phase of engagement has concluded.
Purpose: To facilitate the introduction of simultaneous arrivals using both runways (including suburbs within Brisbane City Council, Logan City Council and Moreton Bay City Council).
Several complex safety and operational factors require further evaluation before options can be produced. Independent parallel runway operations also introduce additional Air Traffic Control staffing and training requirements that must be addressed. As such, the types of flight path changes explained in this factsheet are presented for information only during this phase of Package 3 community engagement, rather than for feedback.
However, you are welcome to submit comments on any local conditions or factors that you would like us to be aware of when developing detailed flight path designs.
Open to feedback until Sunday 15 September 2024.
-
CLOSED: This phase of engagement has concluded.
Purpose: To reduce the frequency and concentration of non-jet flights over communities in Brisbane’s north-east (including suburbs within Moreton Bay City Council).
Please note these are concepts only and not specific flight path location proposals. Please review Set 1 information before giving your feedback.
Open to feedback until Sunday 15 September 2024.
-
Have you seen the tool tips for the baseline model? Give them a try and then please give us your feedback here.
Ensure you're subscribed to the Noise Action Plan for Brisbane for any project updates. If you have a specific question you'd like a direct reply to, please contact us at communityengagement@airservicesaustralia.com
-
CLOSED: This survey has concluded.
Feedback on this trial has now closed. Airservices will conduct an evaluation to determine if this NAP should become a permanent operation, be modified, or if it should cease. We will continue to operate the procedure until completion of the evaluation.
Read more about this operation in this post.
Ensure you're subscribed to the Noise Action Plan for Brisbane for any project updates. If you have a specific question you'd like a direct reply to, please contact us at communityengagement@airservicesaustralia.com
-
CLOSED: This phase of engagement has concluded.
This online session is a general introduction to how we will be conducting the next round of flight path design and community engagement.
Registering to attend ensures you are provided with log-in details for the session, and that you receive any updates about the session if needed. Log-in details for online sessions will be sent to registered participants within 24 hours of each session.
For inquiries or assistance, please contact us at communityengagement@airservicesaustralia.com
-
CLOSED: Phase 4 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
The purpose of this proposal is to reduce the complexity of operating Brisbane’s airspace, to support increased opportunity to use Simultaneous Opposite Direction Parallel Runway Operations (SODPROPS) at Brisbane Airport.
For each topic, we have produced a fact sheet with information on the existing operation and the changes we are proposing. There is also a scalable map for this topic; that is, an online map where you can search for a street address and zoom in to see how the proposals relate to that location. Please review this information before giving your feedback.
Download information sheet – View scalable map
Open to feedback until 14 July 2024.
-
CLOSED: Phase 4 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
The purpose of this proposal is to keep water over aircraft for longer, increasing altitude so aircraft are higher before crossing the coast
For each topic, we have produced a fact sheet with information on the existing operation and the changes we are proposing. There is also a scalable map for this topic; that is, an online map where you can search for a street address and zoom in to see how the proposals relate to that location. Please review this information before giving your feedback.
Download information sheet – View scalable map
Open to feedback until 14 July 2024.
-
CLOSED: Phase 4 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
The purpose of adding these modes is to enable operations in this mode to be more fairly shared across both runway communities
For each topic, we have produced a fact sheet with information on the existing operation and the changes we are proposing. There is also a scalable map for this topic; that is, an online map where you can search for a street address and zoom in to see how the proposals relate to that location. Please review this information before submitting comments.
Download information sheet – View scalable map (Modes 6A and 6C: departures over land) – View scalable map (Modes 6B and 6D: arrivals over land)
Open to feedback until 14 July 2024.
-
CLOSED: Phase 4 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
The purpose of this plan is to increase the use of SODPROPS, including daytime operations
For each topic, we have produced a fact sheet with information on the existing operation and the changes we are proposing. There is also a scalable map for this topic; that is, an online map where you can search for a street address and zoom in to see how the proposals relate to that location. Please review this information before submitting comments.
Open to feedback until 14 July 2024.
-
CLOSED: This phase of engagement has concluded.
In person: registering to attend helps us prepare with enough staff and materials, and ensure you receive any venue or information updates if needed. You're welcome to drop in at any time in the four-hour session. Please note, sessions are being held in areas where residents are most likely to notice a change in aircraft operations as a result of the proposals.
Online: registering to attend ensures you are provided with log-in details for the session, and that you receive any updates about the session if needed. Log-in details for online sessions will be sent to registered participants within 24 hours of each session.
Please note: We make every effort to ensure venues are accessible for people of all abilities, and provide information in a range of formats. Please let us know if you have specific accessibility requirements so we can take appropriate steps to ensure you're able to participate fully in our sessions.
Contact us at communityengagement@airservicesaustralia.com
-
CLOSED: Feedback for this report has concluded.
Airservices Australia is seeking feedback on the Phase 2 Options Assessment Report for the Noise Action Plan for Brisbane.
While we acknowledge that not all community members will necessarily agree with the assessment outcomes, we are specifically seeking feedback on the clarity of the report and the rationale provided for the outcomes reached. Community feedback serves as a cornerstone in our commitment to continuous improvement, including the improvement of our reporting practices.
Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates. If you have a specific question you'd like a direct reply to, please contact us at communityengagement@airservicesaustralia.com
Feedback on this report closes Sunday 16 June 2024.
-
CLOSED: Feedback for this report has concluded.
Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
-
CLOSED: Phase 3 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
CLOSED: Phase 3 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
The purpose of this topic is to reduce the impact of overnight arrivals on communities
This is one of two topics open to feedback until 10 December 2023.
For each topic, we have produced a fact sheet with information on the existing operation and the changes we are proposing. There is also a scalable map for this topic; that is, an online map where you can search for a street address and zoom in to see how the proposals relate to that location.
Information Sheet – Comparison of suburbs overflown – View scalable map (Northerly winds) – View scalable map (Southerly winds)
-
CLOSED: Phase 3 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
CLOSED: Phase 3 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
The purpose of this topic is to reduce the frequency and concentration of flights over communities to the north-west
This is one of two topics open to feedback until 10 December 2023.
For each topic, we have produced a fact sheet with information on the existing operation and the changes we are proposing. There is also a scalable map for this topic; that is, an online map where you can search for a street address and zoom in to see how the proposals relate to that location.
Information Sheet – Comparison of suburbs overflown – View scalable map
-
CLOSED: Phase 3 engagement has now concluded.
-
CLOSED: Phase 2 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
The purpose of this topic is to reduce the impact of concentrated night-time operations on communities
This is one of four topics open to feedback until 10 September 2023. For each topic, we have produced a fact sheet with information on the existing operation and the options we have developed. There is also a scalable map for this topic; that is, an online map where you can search for a street address and zoom in to see how each option relates to that location.
-
CLOSED: Phase 2 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
The purpose of proposals on this topic is to support greater use of SODPROPS (flights over the waters of the bay) including daytime operation
This is one of four topics open to feedback until 10 September 2023. For each topic, we have produced a fact sheet with information on the existing operation and the options we have developed. There is also a scalable map for this topic; that is, an online map where you can search for a street address and zoom in to see how each option relates to that location.
-
CLOSED: Phase 2 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
The purpose of proposals on this topic is to enable operations in this mode to be shared across both runway communities
This is one of four topics open to feedback until 10 September 2023. For each topic, we have produced a fact sheet with information on the existing operation and the options we have developed. There is also a scalable map for this topic; that is, an online map where you can search for a street address and zoom in to see how each option relates to that location.
Fact Sheet - View scalable map (6C) - View scalable map (6D)
-
CLOSED: Phase 2 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
The purpose of proposals on this topic is to improve transparency and quality of information provided to the community
This is one of four topics open to feedback until 10 September 2023. For each topic, we have produced a fact sheet with information on the existing operation - in this case, currently available reporting - and the options we have developed. The fact sheet for this topic also explains the noise abatement procedures currently in operation at Brisbane Airport.
-
CLOSED: This phase of engagement has concluded.
-
CLOSED: Phase 1 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
This engagement has concluded.
-
CLOSED: Phase 1 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
This engagement has concluded.
-
CLOSED: Phase 1 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
-
CLOSED: Phase 1 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
-
CLOSED: Phase 1 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
-
CLOSED: Phase 1 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
-
CLOSED: Phase 1 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
-
CLOSED: Phase 1 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
-
CLOSED: Phase 1 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
-
CLOSED: Phase 1 engagement has concluded
-
Community members who have registered for an online Q&A session in September are invited to submit questions in advance for response the Trax consultants. Please submit each question separately and let us know which session you're attending. You can submit as many questions as you wish, just start the survey again if you'd like to submit more than three - this is to help us answer as many as we can in the 90 minute session.
-
Thank you for making an appointment to meet with Trax and Airservices to discuss Package 3 of the Noise Action Plan for Brisbane. We're sorry you weren't able to come. To help us with our planning and to continually improve our community engagement service, please let us know why you couldn't attend.
Follow Project
Timeline
-
Engagement phase 1
Noise Action Plan for Brisbane has finished this stageApril - May 2023
-
Engagement phase 2
Noise Action Plan for Brisbane has finished this stageJuly - September 2023
-
Engagement phase 3
Noise Action Plan for Brisbane has finished this stageOctober - December 2023
-
Engagement phase 4
Noise Action Plan for Brisbane has finished this stageMay - July 2024
-
Engagement Phase 5
Noise Action Plan for Brisbane is currently at this stageAugust - September 2024
-
Engagement Phase 6
this is an upcoming stage for Noise Action Plan for BrisbaneEarly 2025
Detailed design of preferred options progressed from Phase 5
-
Package 4
this is an upcoming stage for Noise Action Plan for BrisbaneMid-2025
- Optimise the performance of the wider Brisbane airspace system.
Documents
- Noise Action Plan for Brisbane (259 KB) (pdf)
- Noise Action Plan for Brisbane Overview (376 KB) (pdf)
- Communications Approach
-
Phase 1 Engagement and outcomes
- Phase One Engagement Promotion (200 KB) (pdf)
- Alternative Daytime Over Water Departure Path - South (843 KB) (pdf)
- Alternative Night-time Over Water Departure Paths - South and West (2.02 MB) (pdf)
- Jet Aircraft Early Turn Opportunities - South, East, North-East (942 KB) (pdf)
- Replace New Runway Departure with Pre-existing Legacy Runway Departure - West (864 KB) (pdf)
- Turboprop Over Land Departures 5am to 6am - North (660 KB) (pdf)
- Night-time Over Land Departure Opportunities - North (780 KB) (pdf)
- Baseline Model Development (558 KB) (pdf)
- Draft Communications Approach (598 KB) (pdf)
- Noise Improvement Trial Assessment (618 KB) (pdf)
- Noise Action Plan for Brisbane_Noise Improvement Trials Assessment Report_FINAL.pdf (504 KB) (pdf)
- Phase 1 Options Assessment Report (1.56 MB) (pdf)
- Phase 1 Options Assessment Summary (513 KB) (pdf)
- Phase 2 Engagement and outcomes
- Phase 3 Engagement
- Phase 4 Engagement
- Phase 5 Engagement
- Scope of consultancies supporting delivery of the Noise Action Plan for Brisbane (206 KB) (pdf)
- Reference documentation