CLOSED: Phase 2 feedback period has closed. Please ensure you are subscribed to the Noise Action Plan for Brisbane project page to receive updates.
Phase 2 - Simultaneous Opposite Direction Parallel Runway Operations (SODPROPS)
The purpose of proposals on this topic is to support greater use of SODPROPS (flights over the waters of the bay) including daytime operation
This is one of four topics open to feedback until 10 September 2023. For each topic, we have produced a fact sheet with information on the existing operation and the options we have developed. There is also a scalable map for this topic; that is, an online map where you can search for a street address and zoom in to see how each option relates to that location.